Bildik Mühendislik

Mechanical / CCGT POWER PLAND FOR YENİ AEN İNŞAAT /ANSALDO ENERGY.

Date of Contract
:
01/01/2013
Place the delivery date
:
02/01/2013
Work completion date
:
30/09/2013
The duration of work
:
270 WORK DAY.
Administration
:
YENİ AEN İNŞAAT - ANSALDO ENERJİ.
Employer
:
GC ENERGY .
Project place
:
DİLOVASI/GEBZE/İSTANBUL.
Details
:

Installation and calibration of control and measurement instrumentation on BOP; Installation and connection of transformers, electrical switchgears, capacitor banks, control cabinets and J-Boxes; Construction of cable routes together with supporting structures; laying and connecting medium and low voltage cables, control cables, measurement cables, Profi-Bus and fiber optic cables; Fire protection, potential equalization installations, cathode protection installations; Installation tests and measurements

Bildik Mühendislik G.O.P. Mahallesi Ankara Cad. No:112/70 Gölbaşı / Ankara - T: +90 (312) 484 28 53 - F: +90 (312) 484 03 55 - info@bildikmuhendislik.com.tr
© 2013
Web Tasarım